The five-star city hotel first opened its doors in 2018. The podium structure has been abandoned for more than a decade. A survey of the existing structure was conducted and results were used to perform integrity assessment.
• Transferred structure to transfer podium columns to 20cm bearing wall in the upper level guest rooms.
• Façade structure to accommodate complex modern architectural design